IntroductIon
Contained in this manual are installation instructions,
maintenance procedures and parts information for the
1-inch and 2-inch Mark D and DA Series Globe and
Angle Style Control Valves. Refer to the appropriate
manuals for instructions for the accompanying actua-
tor and additional accessories.
Trained or experienced personnel should carry out
operation and installation of all pressure equipment.
If you have any questions regarding the equipment,
contact your Jordan Valve representative.
InstallatIon
Warning
Jordan Valve recommends the use of protective
clothing, gloves and eyewear when performing any
installation or maintenance.
Installation of the valve assembly under conditions
which exceed the limits outlined in this manual
or on the nameplate may result in personal injury.
Overpressure may cause sudden release of pro-
cess pressure or bursting of assembly parts.
The valve conguration and construction materials
of each assembly are specied during ordering to
meet specic pressure, temperature, pressure drop
and controlled uid conditions. Do not operate any
part of the assembly outside of those conditions
without rst contacting Jordan Valve.
1. Before installing the valve, inspect the valve
body cavity for foreign material.
2. Remove all foreign materials such as scale or
welding slag from all pipelines.
3. Unless limited by existing seismic condi-
tions, the control valve assembly may be
installed in any position. The normal
method is with the actuator vertical above
the valve.
4. Install the valve so the process flow co-
incides with direction shown by the arrow
on the valve body.
5. Use accepted piping and welding
practices when installing the valve in the
line. For flanged valve bodies, use
suitable gaskets between the body
flanges and pipeline flanges.
Note
Post-welding heat treatment may be required
on some valve body materials. Avoid damage
to internal elastomeric, plastic and metal parts
by removing all trim. For more information,
contact your Jordan Valve representative.
6. For screwed end connections, apply pipe
compound to pipeline threads.
7. Install a conventional 3-valve bypass
around the body to allow for continuous
operation during maintenance
and inspection.
8. If your actuator and valve body were
shipped separately, refer to the
proper Product Manual for actuator
mounting procedures.
Warning
Packing leakage could result in personal injury.
Valve packing is tightened prior to shipping
but may require readjustment to meet specic
service conditions.
Warning: Jordan Valve Control Valves must only be used, installed and repaired in accordance with these Installa-
tion & Maintenance Instructions. Observe all applicable public and company codes and regulations. In the event
of leakage or other malfunction, call a qualified service person; continued operation may cause system failure or
a general hazard. Before servicing any valve, disconnect, shut off, or bypass all pressurized fluid. Before disassem-
bling a valve, be sure to release all spring tension.
3170 Wasson Road • Cincinnati, OH 45209
Phone 513.533.5600 • Fax 513.871.0105 (f)
[email protected] • www.jordanvalve.com
I & M Mark D and DA Series
Installation & Maintenance Instructions for the
Mark D & DA Globe and Angle Style Control Valves
Page view 0
1 2 3 4 5 6 7 8 9 10

Summary of Contents

Page 1 - InstallatIon

IntroductIonContained in this manual are installation instructions, maintenance procedures and parts information for the 1-inch and 2-inch Mark D and

Page 2 - MaIntenance

Key 8 Seat RingBody Size(in)Orifice Size (in)316 SST 316 SST with Alloy 6316 SST with Tungsten Carbidemm in16.4 1/4 1B50973507 1B50970012 1J6886000A9.5

Page 3 - Packing Maintenance

Mark D anD Da SerieS Globe anD anGle Style Control ValVeS-2-MaIntenanceWarning Personal injury may result from sudden re lease of any process pre

Page 4 - Packing Replacement

-3-Packing LubricationAn optional lubricator or lubricator/isolating valve (Figure 1) may have been installed in place of the pipe plug within the tap

Page 5 - Trim Maintenance

-4-Packing ReplacementWarning Prior to performing any maintenance procedures, review the warning notes at the beginning of the Maintenance sect

Page 6 - Parts Ordering

-5-Trim MaintenanceDisassembly1. Remove the actuator and the bonnet as de- scribed in steps 1 through 3 of the “Replacing Packing” procedure.War

Page 7

Assembly Continued,8. Use the sequence shown in Figure 2 to install new packing and associated parts.9. Place a smooth-edged pipe over the valve

Page 8

-7-Mark D Series Control Valve AssemblyMark D anD Da SerieS Globe anD anGle Style Control ValVeSFigure 3: Mark D Series Globe Valve1234567891011121314

Page 9 - Parts List

-8-Mark DA Series Angle Valve AssemblyFigure 3a: Mark DA Series Angle ValveMark D anD Da SerieS Globe anD anGle Style Control ValVeS12345678919181716

Page 10

-9-Key Quantity Part Name Material Part Number1 2Pac

Comments to this Manuals